General Contracting: Building Industrial Solutions

Challenge:

The production facility was running out of space and needed a solution without expanding the building. The client requested a fully scoped project plan, to include plans, materials, schedules and construction.

Solutions: 
FS 360 engineered, designed and constructed an industrial mezzanine solution, that included imbedded modular offices. We conducted multiple client interviews to ascertain the anticipated usage to determine the required loads and structural design requirements for the structure. In addition, FS 360 investigated all materials alternatives to identify the best solution. The outcome of our scope of work was a unit based pricing methodology that the client used to budget installation of multiple structures throughout the facility. Finally, our work included managing the entire construction project until completion.